Skip to content

Islington · EC1V

Splashbacks and upstands in St Luke's

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

St Luke's kitchens

What the kitchens here are actually like

1930s municipal blockVictorian model-dwelling blockwarehouse conversionmodern tower

Thick external walls, deep window reveals and boxed risers mean the runs are templated to what is there rather than to a rectangle. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. The wall decides, not the brochure.

The older blocks have solid walls, boxed stacks and no scope to extend in any direction.

Old Street and City Road are red routes, and the estates have courtyards with bollards and narrow arched entries built for handcarts rather than vans. A lot of interwar and Victorian model-dwelling flats with small fixed kitchens of about 2.4m and a single window, sitting alongside newer towers with open-plan runs.

The original kitchen was a small service room, so what is there now is a knock-through and the junction between the two floors is rarely level. Boxed risers break the run into returns, and every return is a separate piece with its own mitred corner. Decided before fabrication starts.

The mix here is 1930s municipal block, Victorian model-dwelling block, warehouse conversion and modern tower. Which of those you have decides most of what follows.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered from the Watford patch. Fitted 3–7 working days from template.

1930s and inter-war semis

The building, and what it does to the job

Stone stairs and iron rails mean corner protection on every turn, since a chipped edge on the way up is the most common loss on these blocks.

Boxing is rarely the same depth at worktop height as it is at floor level, so measuring it low down is the usual reason a top will not sit back. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. An upstand rides what a panel exposes.

1930s and inter-war semis

Getting stone into the room

The older blocks are walk-ups with stone stairs and iron balustrades that do not forgive a swung slab.

1930s and inter-war semis

What gets asked for here

It is on the shortlist for this patch rather than at the top of it, because worktop replacement comes up more often. Nothing about the process differs between the two.

Access

Getting stone into a St Luke's kitchen

Old Street and City Road are red routes, and the estates have courtyards with bollards and narrow arched entries built for handcarts rather than vans. The older blocks are walk-ups with stone stairs and iron balustrades that do not forgive a swung slab.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

Watford patch

St Luke's is worked from our Watford run, covering Hertfordshire & North London.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in St Luke's

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Is St Luke's on your patch?

Yes. St Luke's is on the patch, and the postcodes we work here are EC1V. It is run from the Watford side, covering Hertfordshire & North London. A red route means no stopping, and no stopping means exactly that, so the stone comes in from a side street or from a bay behind the property. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Why would worktop splashbacks & upstands in St Luke's be any different from anywhere else?

Inter-war purpose-built blocks have curved external walls and steel windows, so a run along an outside wall is following a genuine curve rather than a bow. Boxed risers break the run into returns, and every return is a separate piece with its own mitred corner. Decided before fabrication starts. Stone stairs and iron rails mean corner protection on every turn, since a chipped edge on the way up is the most common loss on these blocks.

How would you get a worktop into a property in St Luke's?

Old Street and City Road are red routes, and the estates have courtyards with bollards and narrow arched entries built for handcarts rather than vans. The older blocks are walk-ups with stone stairs and iron balustrades that do not forgive a swung slab. Communal stairs get boarded and the handrail padded, and we walk the route with a tape before the first piece leaves the van. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. It decides panel size before anything is cut. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.

Do you do much worktop splashbacks & upstands around St Luke's?

It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Same batch, same run, same day. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Same batch, same run, same day.

What moves the number on a quote around here?

The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Corners get their own pieces. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What needs to be ready before you come to St Luke's?

A notch around a boxed stack is machined with a radius at the internal corner, because a square inside corner there is exactly where a top will crack. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Scribed, dubbed out, or set proud. Pick one. The riser boxing must be finished in its final form and any access panel positions agreed before the template, since the stone is set out around them. The same building type can arrive as a careful one-off kitchen or as a fast turnaround, and the honest answer is that they are priced differently. Splashbacks are cut from the same slab run as the tops, so they have to be decided before fabrication, not after. The wall has to be ready.

Next step

Splashbacks and upstands in St Luke's, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7479 194398