Islington · EC1V
Worktop replacement in St Luke's
Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.
St Luke's kitchens
What the kitchens here are actually like
Thick external walls, deep window reveals and boxed risers mean the runs are templated to what is there rather than to a rectangle. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. Stone is far heavier than what is coming off.
The older blocks have solid walls, boxed stacks and no scope to extend in any direction.
A lot of interwar and Victorian model-dwelling flats with small fixed kitchens of about 2.4m and a single window, sitting alongside newer towers with open-plan runs. Old Street and City Road are red routes, and the estates have courtyards with bollards and narrow arched entries built for handcarts rather than vans.
Balcony access and long communal corridors are often the carry route, and both are narrower than they look with a piece on edge. A full stone piece is several times the weight of the laminate coming out, and there is rarely room to turn it on a half-landing. Sound carcasses are the one condition.
What turns up on the job sheets is 1930s municipal block, Victorian model-dwelling block, warehouse conversion and modern tower. The differences between them show up at template, not at enquiry.
True everywhere
Worktop replacement, in short
- The units stay. Only the surface changes.
- Old tops come out in the morning, new stone is down and sealed the same day.
- A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
- The carcasses have to be sound: stone is far heavier than laminate.
Covered from the Watford patch. Fitted 3–7 working days from template.
1930s and inter-war semis
Getting stone into the room
The older blocks are walk-ups with stone stairs and iron balustrades that do not forgive a swung slab.
The realistic answer on a main road is an early slot, a spotter on the van and pieces staged in one movement rather than several trips. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. It is a full day at the kerb, not a delivery.
1930s and inter-war semis
The building, and what it does to the job
Stone stairs and iron rails mean corner protection on every turn, since a chipped edge on the way up is the most common loss on these blocks.
Stair and lift dimensions being discovered on the day; a full quartz or granite piece is several times the weight of the laminate coming out and there is rarely room to turn it on a half-landing.
1930s and inter-war semis
What gets asked for here
This is the job the local stock asks for first, ahead of worktop splashbacks & upstands and worktop installation.
Access
Getting stone into a St Luke's kitchen
Old Street and City Road are red routes, and the estates have courtyards with bollards and narrow arched entries built for handcarts rather than vans. The older blocks are walk-ups with stone stairs and iron balustrades that do not forgive a swung slab.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
Watford patch
St Luke's is worked from our Watford run, covering Hertfordshire & North London.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop replacement in St Luke's
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you actually work in St Luke's, or just list it?
Yes. St Luke's is on the patch, and the postcodes we work here are EC1V. It is run from the Watford side, covering Hertfordshire & North London. The realistic answer on a main road is an early slot, a spotter on the van and pieces staged in one movement rather than several trips. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. It is a full day at the kerb, not a delivery. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
What is different about worktop replacement in St Luke's?
These blocks were built with a lift from new, which will usually take a worktop and almost never takes a full-length island piece. A mansion block is a logistics job before it is a stone job. What is under the old top is the real question. Stone stairs and iron rails mean corner protection on every turn, since a chipped edge on the way up is the most common loss on these blocks.
Is access a problem in St Luke's?
Old Street and City Road are red routes, and the estates have courtyards with bollards and narrow arched entries built for handcarts rather than vans. The older blocks are walk-ups with stone stairs and iron balustrades that do not forgive a swung slab. A walk-up with winders at every half-landing means the piece is rested and re-gripped on the way, so the crew size goes up before the piece size comes down. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. It sets what the day actually looks like. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.
Is worktop replacement the job you do most in St Luke's?
Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop splashbacks & upstands and worktop installation. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. The carcasses have to be sound, because stone is several times the weight of what is coming off. Sound carcasses or it does not go ahead. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Old tops out in the morning, new stone down and sealed the same afternoon. A plumber either side of us.
What decides the price of a worktop in St Luke's?
Two parallel runs with a walkway between them is the most efficient shape there is on a slab, because both pieces nest as straight lengths with almost no waste. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. Height change is checked before we cut. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What do I need to sort out first?
Anything that has to stay accessible, a stopcock, a gas meter, a riser panel, is marked on the template so the stone is cut around it instead of over it. We would rather find it at template than on the morning, which is why the templater looks behind the units. It is the usual surprise, and it is a known one. Get the managing agent's or freeholder's approval and the permitted hours confirmed beforehand, and agree with the porter who protects the communal carpet, stonework and lift. Mixed ownership means the decision-maker is not always the person who lets us in, so it is worth being clear early about who signs the quote off. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Sound carcasses are the condition.
Related
More around St Luke's
Other work we do in St Luke's
Next step
Worktop replacement in St Luke's, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.