Islington · EC1Y EC2A
Splashbacks and upstands in Bunhill
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
Bunhill kitchens
What the kitchens here are actually like
Services coming up through a floor slab mean the island cannot move to suit the stone, so the stone is cut to suit the island. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Same slab run, same day, same batch.
Predominantly flats in tall blocks with compact galley kitchens of 2.4-2.8m against a fixed services wall. The newer developments have open-plan kitchen-living rooms, but the floorplates favour a peninsula return over a freestanding island.
Congestion Charge zone with red routes on City Road and Old Street, plus a low-traffic scheme covering the residential streets behind. Managing agents here run tight access rules, so confirm lift dimensions and protection requirements in writing at template stage rather than turning up with a full van.
Steel columns and downstands land where the frame put them, which is frequently in the middle of what would otherwise be a clean run. Setting the panel proud on a subframe with a shadow gap reads as a detail; scribing to raw brick rarely does. The wall makes that decision, not the brochure.
The buildings themselves are mostly post-war estate block, modern tower, warehouse conversion and Victorian block. Which of those you have decides most of what follows.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered from the Watford patch. Fitted 3–7 working days from template.
ex-local-authority flats and estates
The building, and what it does to the job
Old brickwork with recessed or blown mortar joints, which gives the stone nothing continuous to bear on and forces either a batten frame or a dubbed-out backing board.
ex-local-authority flats and estates
The shape of the run
An island is a single visible piece with four finished edges and no wall to hide against, so it is the piece the whole kitchen is judged on. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Corners get their own pieces.
ex-local-authority flats and estates
Getting stone into the room
Tower access runs through a booked service lift and an agreed delivery window with the managing agent.
ex-local-authority flats and estates
What gets asked for here
It is on the shortlist for this patch rather than at the top of it, because worktop replacement comes up more often. Nothing about the process differs between the two.
Access
Getting stone into a Bunhill kitchen
Congestion Charge zone with red routes on City Road and Old Street, plus a low-traffic scheme covering the residential streets behind. Tower access runs through a booked service lift and an agreed delivery window with the managing agent.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
Watford patch
Bunhill is worked from our Watford run, covering Hertfordshire & North London.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in Bunhill
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you actually work in Bunhill, or just list it?
Yes. Bunhill is on the patch, and the postcodes we work here are EC1Y, EC2A. It is run from the Watford side, covering Hertfordshire & North London. Where the frontage is a clearway the unload happens away from the door and the carry gets longer, which is a crew and time question rather than a stone one. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. One trip is always better than three. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
What is different about worktop splashbacks & upstands in Bunhill?
The goods lift is generous and the flat entrance often is not, so the tightest point on the route is inside the flat rather than in the building. Exposed brick is the defining issue: the face is uneven by 10mm or more across a bay, so a stone splashback either scribes to it, which means the back of the panel has to be relieved, or it is deliberately set proud on a subframe with a shadow reveal all round. The wall makes that decision, not the brochure. Managing agents here run tight access rules, so confirm lift dimensions and protection requirements in writing at template stage rather than turning up with a full van.
Is access a problem in Bunhill?
Congestion Charge zone with red routes on City Road and Old Street, plus a low-traffic scheme covering the residential streets behind. Tower access runs through a booked service lift and an agreed delivery window with the managing agent. The lift has to be booked and blanketed before anything moves, and that booking needs to cover the old tops coming out as well as the new stone going in. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Joint positions follow from that. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.
Do you do much worktop splashbacks & upstands around Bunhill?
It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Same batch, same run, same day. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Siliconed to the worktop, never grouted.
What decides the price of a worktop in Bunhill?
On a heavily veined stone the island and the run behind it are nested off the same area of slab so the movement relates across the room. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Corners get their own pieces. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What do I need to sort out first?
An intruding steel column, a brick pier or a downstand breaks a run that would otherwise have been one clean piece. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. An upstand rides what a panel exposes. Decide and build the backing method — scribe, subframe or board — before the template, because the templater is measuring to that face and not to the brick. Where the owner is not local, the decisions happen remotely, so photographs and a clear itemised drawing carry more weight than a showroom visit ever would. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Decided before fabrication, not after.
Related
More around Bunhill
Other work we do in Bunhill
Next step
Splashbacks and upstands in Bunhill, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.