Skip to content

City of Westminster · SW1V

Splashbacks and upstands in Pimlico

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

Pimlico kitchens

What the kitchens here are actually like

Cubitt stucco terrace conversion1950s Churchill Gardens block1970s Lillington Gardens brick estate

The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Same slab run, same day, same batch.

Conversion flats in the stucco terraces have small kitchens carved out of grand rooms, typically a 2.4m galley with high ceilings and a cornice cut short. The post-war estate flats have purpose-built kitchens of about 2.5m by 2m with a fitted larder - workable, but there is no island going in either.

Street parking is permit and pay-by-phone with a lot of resident pressure, and the wider stucco streets have suspended bays for other trades most weeks.

The flat entrance door and the internal doorways are usually tighter than the communal stairs, which is the opposite of what most people assume. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here — it rides the bow and hides the junction the worktop can never close on its own. Decided before fabrication starts.

On these streets the housing is Cubitt stucco terrace conversion, 1950s Churchill Gardens block and 1970s Lillington Gardens brick estate. Each of those behaves differently once the old top comes off.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered from the Watford patch. Fitted 3–7 working days from template.

Victorian and Edwardian terraces

Getting stone into the room

Estate blocks are the constraint - low-rise sections with no lift at all, walkway access, and communal doors that must not be wedged.

Permit hours are what matters, not the permit itself, because a bay that frees up at six in the evening is no use for a template at ten. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. That is why they are crated the way they are.

Victorian and Edwardian terraces

What gets asked for here

Honestly, this is not what we do most on this patch. Worktop replacement, worktop templating and worktop installation come up more often. That is a statement about the local housing rather than about the work, and nothing about how it is quoted, cut or fitted changes because of it.

Victorian and Edwardian terraces

The building, and what it does to the job

Post-war estate kitchens use non-standard cabinet depths and out-of-square corners from the original concrete frame - template every corner, do not assume 90 degrees.

Access

Getting stone into a Pimlico kitchen

Estate blocks are the constraint - low-rise sections with no lift at all, walkway access, and communal doors that must not be wedged. Street parking is permit and pay-by-phone with a lot of resident pressure, and the wider stucco streets have suspended bays for other trades most weeks.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

Watford patch

Pimlico is worked from our Watford run, covering Hertfordshire & North London.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Pimlico

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Is Pimlico on your patch?

Yes. Pimlico is on the patch, and the postcodes we work here are SW1V. It is run from the Watford side, covering Hertfordshire & North London. Enforcement zones rarely accept a trade van unloading stone as an exemption, so this gets sorted before the date is confirmed rather than argued about afterwards. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. That is why they are crated the way they are. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Why would worktop splashbacks & upstands in Pimlico be any different from anywhere else?

A villa cut into flats leaves kitchens in rooms that were never kitchens, with services run to wherever they could physically be made to reach. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. The wall makes that decision, not the brochure. Post-war estate kitchens use non-standard cabinet depths and out-of-square corners from the original concrete frame - template every corner, do not assume 90 degrees.

How would you get a worktop into a property in Pimlico?

Estate blocks are the constraint - low-rise sections with no lift at all, walkway access, and communal doors that must not be wedged. Street parking is permit and pay-by-phone with a lot of resident pressure, and the wider stucco streets have suspended bays for other trades most weeks. Communal stairs get boarded and the handrail padded, and we walk the route with a tape before the first piece leaves the van. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Joint positions follow from that. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.

Is Pimlico really a worktop splashbacks & upstands area?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop replacement, worktop templating and worktop installation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Conversions put kitchens where the services could be made to reach rather than where they belong, so runs are short and interrupted. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Same batch, same run, same day. A kitchen carved out of a larger room sits under whatever the original plan left behind, so the run frequently ends at a blocked doorway or a boxed-in service. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Same batch, same run, same day.

What moves the number on a quote around here?

The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Corners get their own pieces. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What needs to be ready before you come to Pimlico?

The stone carries the scribe because the wall cannot be persuaded, so back edges are cut oversize and eased in rather than dropped straight down. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Scribed, dubbed out, or set proud. Pick one. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Where a landlord or housing provider is involved there is a specification to meet and a process to follow, and both are settled before a date is offered. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Decided before fabrication, not after.

Next step

Splashbacks and upstands in Pimlico, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7479 194398