City of Westminster · SW1P
Splashbacks and upstands in Millbank
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
Millbank kitchens
What the kitchens here are actually like
The room is square, the walls are plumb and the floor is flat, so almost every complication in the job belongs to the building rather than the kitchen. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Siliconed to the top, never grouted.
Riverside blocks with generous flats but old-fashioned kitchen rooms - typically a 3m run and a return with a serving hatch that clients want closed up.
Refurbishments here are about modernising an enclosed kitchen rather than opening it into the living room, because the walls are usually structural. Closing up a hatch leaves a patched wall that is never flush with the rest - template after the plastering, not before, or the upstand will not sit tight. Millbank itself is a red route so vehicles use the block's own forecourt or a booked bay.
Floor-to-ceiling glazing lights the worktop from one side all day, which shows every ripple in a polished surface and every gap at a scribe. The plasterboard is flat enough for a full-height panel; it is the socket positions that cause the trouble. Cut from the same slab run as the tops.
The stock behind these kitchens runs to 1930s riverside mansion block, 1990s riverside apartment and institutional conversion. They are not interchangeable, and a worktop finds the differences quickly.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered from the Watford patch. Fitted 3–7 working days from template.
mansion blocks and purpose-built flats
Getting stone into the room
Purpose-built blocks with porters, a residents' lift and a separate service lift, and most managing agents restrict works to weekday daytime with no weekend noise.
The lift has to be booked and blanketed before anything moves, and that booking needs to cover the old tops coming out as well as the new stone going in. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. It decides panel size before anything is cut.
mansion blocks and purpose-built flats
What gets asked for here
The research on this patch does not put this among the three commonest jobs. Worktop replacement, worktop templating and worktop installation do. That changes how often we are here, not how the work is done.
Access
Getting stone into a Millbank kitchen
Purpose-built blocks with porters, a residents' lift and a separate service lift, and most managing agents restrict works to weekday daytime with no weekend noise. Millbank itself is a red route so vehicles use the block's own forecourt or a booked bay.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
Watford patch
Millbank is worked from our Watford run, covering Hertfordshire & North London.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in Millbank
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you cover Millbank?
Yes. Millbank is on the patch, and the postcodes we work here are SW1P. It is run from the Watford side, covering Hertfordshire & North London. Where the frontage is a clearway the unload happens away from the door and the carry gets longer, which is a crew and time question rather than a stone one. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. One trip is always better than three. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Does the housing in Millbank change how worktop splashbacks & upstands works?
These buildings have firm rules about what can be propped open, left in a lobby or carried through the residents entrance. Every socket, switch and any USB point has to be cut out of the stone to the actual measured position, so the template has to be taken with the faceplates off and the back boxes visible. The wall makes that decision, not the brochure. Closing up a hatch leaves a patched wall that is never flush with the rest - template after the plastering, not before, or the upstand will not sit tight.
How does the stone actually reach a kitchen in Millbank?
Purpose-built blocks with porters, a residents' lift and a separate service lift, and most managing agents restrict works to weekday daytime with no weekend noise. Millbank itself is a red route so vehicles use the block's own forecourt or a booked bay. A car that takes 2.4m on the diagonal will not take a three-metre worktop however it is stood, and there is no trimming it on the landing. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. That is agreed at template, not on fitting day. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.
Do you get much worktop splashbacks & upstands work in Millbank?
Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop replacement, worktop templating and worktop installation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Handover-spec kitchens are square, plumb and predictable, which means the join count is honest and driven by run length rather than by the building. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Sockets final before template. Developer-fitted kitchens come with thin cam-lock carcasses, which are fine under laminate and want bracing before stone goes on them. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Same batch, same run, same day.
Why do two Millbank kitchens the same size price differently?
Two parallel runs with a walkway between them is the most efficient shape there is on a slab, because both pieces nest as straight lengths with almost no waste. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. The joint to the worktop is siliconed, never grouted. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What has to be finished before you can template?
A low sill over the sink run is what decides between an upstand and stone dying into a window board, and there is often less clearance than an upstand is tall. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Scribed, dubbed out, or set proud. Pick one. Any socket you intend to move must be moved and re-plastered before templating, because a cut-out in the wrong place means a new piece of stone. Mixed ownership means the decision-maker is not always the person who lets us in, so it is worth being clear early about who signs the quote off. Full-height panels need the wall made good first, which is another trade and another timescale. Same slab run as the tops.
Related
More around Millbank
Other work we do in Millbank
Next step
Splashbacks and upstands in Millbank, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.