Greenwich · SE9
Worktop replacement in New Eltham
Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.
New Eltham kitchens
What the kitchens here are actually like
A side passage and a back door mean the stone rarely has to come through the house, which changes the job more than most people expect. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. Stone is far heavier than what is coming off.
Wider interwar plots than Eltham proper with more detached houses and chalet bungalows, so kitchens are square rather than long — usually reworked into a U with a peninsula. A fair number of bungalow kitchens have low ceilings and window sills that sit close to the worktop.
Good: nearly every house has a drive or hardstanding, the roads are wide and turning space is easy, with pinch points only around the station and the shops.
Where the roof has been converted there is usually a steel over the kitchen that went in after the walls, and the run beneath it is worth checking for square. The junction between the old floor and the extension floor is where a run crossing it needs packing before stone goes on. Sound carcasses are the one condition.
On these streets the housing is 1930s semi, interwar chalet bungalow, 1960s detached and postwar infill. The differences between them show up at template, not at enquiry.
True everywhere
Worktop replacement, in short
- The units stay. Only the surface changes.
- Old tops come out in the morning, new stone is down and sealed the same day.
- A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
- The carcasses have to be sound: stone is far heavier than laminate.
Covered from the New Malden patch. Fitted 3–7 working days from template.
1930s and inter-war semis
Getting stone into the room
A drive that shelves towards the house needs the van chocked and the trolley controlled, since a loaded A-frame gathers speed quickly on a slope. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. It is a full day at the kerb, not a delivery.
1930s and inter-war semis
The building, and what it does to the job
Low sills under the sink window are common in the bungalows — check upstand height at template stage or you'll be cutting on site.
1930s and inter-war semis
What gets asked for here
It is on the shortlist for this patch rather than at the top of it, because worktop installation comes up more often. Nothing about the process differs between the two.
Access
Getting stone into a New Eltham kitchen
Good: nearly every house has a drive or hardstanding, the roads are wide and turning space is easy, with pinch points only around the station and the shops.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
New Malden patch
New Eltham is worked from our New Malden run, covering South West London & Surrey.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop replacement in New Eltham
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you cover New Eltham?
Yes. New Eltham is on the patch, and the postcodes we work here are SE9. It is run from the New Malden side, covering South West London & Surrey. Off-street parking means the van stays put all day, so tools, packers and the offcut we would rather have than not are all within reach. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. It is a full day at the kerb, not a delivery. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Does the housing in New Eltham change how worktop replacement works?
Wide doorways and level thresholds mean full-length pieces go in whole and the join count comes down to slab length alone. What catches people out is the junction between the old floor and the extension floor, which is rarely at the same level, so a run carrying across it needs the units packed before stone goes on. What is under the old top is the real question. Low sills under the sink window are common in the bungalows — check upstand height at template stage or you'll be cutting on site.
How does the stone actually reach a kitchen in New Eltham?
Good: nearly every house has a drive or hardstanding, the roads are wide and turning space is easy, with pinch points only around the station and the shops. The van gets close to the door and the stone comes off the tail lift onto a trolley, which is about the shortest carry we ever get. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. The strip-out is planned around it. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.
Is worktop replacement common in New Eltham?
It is one of the three we do most here, behind worktop installation. Same template visit, same workshop, same installers either way. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Old tops out in the morning, new stone down and sealed the same afternoon. Sound carcasses or it does not go ahead. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. The carcasses have to be sound, because stone is several times the weight of what is coming off. Sound carcasses or it does not go ahead.
Why do two New Eltham kitchens the same size price differently?
A U shape uses more linear metres than people expect, and the two returns rarely nest together, so a second slab is a genuine possibility. Going from a 38mm laminate to 20mm or 30mm stone drops the surface, which shows against tiles, a window board and any freestanding appliance. Height change is checked before we cut. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What has to be finished before you can template?
Where a run finishes into a reveal, the depth of that reveal is taken at worktop height and nowhere else. We would rather find it at template than on the morning, which is why the templater looks behind the units. Found at template, not on fit day. Unlock the side gate and clear the alley of bins, bikes and pots, and arrange a plumber for the sink and an electrician if the hob is hard-wired. Where someone is living in the house through the work, the strip-out and the fit are planned so the kitchen is out of use for a day and not a week. If the carcasses are tired the honest answer is that stone will find that out, and it is better said before than after. Sound carcasses are the condition.
Related
More around New Eltham
Other work we do in New Eltham
Next step
Worktop replacement in New Eltham, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.