Greenwich · SE18
Worktop replacement in Plumstead
Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.
Plumstead kitchens
What the kitchens here are actually like
Lath and plaster, a settled floor and a hall with a turn in it are the three things that decide how this job runs. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. Stone is far heavier than what is coming off.
Steep hillside streets with permit parking and no driveways, plus long flights of front steps on the upper roads — the carry is usually uphill and through the house rather than round the side. Straight galley runs of 2.4m to 3.2m, wall units both sides, no island. Tight Victorian terraces stepping up the hill, most with a narrow back-addition kitchen, and a high proportion of flat conversions where the kitchen has been fitted into whatever room was left.
Cornice, picture rails and deep skirting survive in converted rooms, so the run stands off the wall and the back edge follows the units rather than the plaster. What the old top has been hiding is usually a floor that settled towards the back and units that were never fixed back to the wall. What is under the old top is the real question.
The buildings themselves are mostly dense Victorian terrace, Edwardian terrace, postwar estate and 1980s infill. They are not interchangeable, and a worktop finds the differences quickly.
True everywhere
Worktop replacement, in short
- The units stay. Only the surface changes.
- Old tops come out in the morning, new stone is down and sealed the same day.
- A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
- The carcasses have to be sound: stone is far heavier than laminate.
Covered from the New Malden patch. Fitted 3–7 working days from template.
Victorian and Edwardian terraces
Getting stone into the room
Door width, hall width and the diagonal at the turn are three separate measurements, and it is the diagonal that catches people out. We plan the strip-out and the carry as one movement so the kitchen is only out of use for a single day. That is agreed before a plumber is booked.
Victorian and Edwardian terraces
The building, and what it does to the job
Old lath-and-plaster and soft brick mean scribing to bowed walls is normal; assume the back wall is out by 15mm over 3m.
Floors and walls that have settled towards the back addition, so the existing run is out of level and the stone will show it the moment it is set and levelled properly.
Victorian and Edwardian terraces
What gets asked for here
The research on this patch puts this at the top of the list, above worktop templating and worktop fabrication.
Access
Getting stone into a Plumstead kitchen
Steep hillside streets with permit parking and no driveways, plus long flights of front steps on the upper roads — the carry is usually uphill and through the house rather than round the side.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
New Malden patch
Plumstead is worked from our New Malden run, covering South West London & Surrey.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop replacement in Plumstead
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you cover Plumstead?
Yes. Plumstead is on the patch, and the postcodes we work here are SE18. It is run from the New Malden side, covering South West London & Surrey. A controlled parking zone means either a visitor permit sorted in advance or a suspended bay, and a suspension is applied for days ahead rather than on the morning. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. It is a full day at the kerb, not a delivery. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Does the housing in Plumstead change how worktop replacement works?
Cornice, picture rails and deep skirting survive in converted rooms, so the run stands off the wall and the back edge follows the units rather than the plaster. In most Victorian terraces the kitchen sits in the back addition, so you get a narrow galley with one outside wall and nothing square to work off. What is under the old top is the real question. Old lath-and-plaster and soft brick mean scribing to bowed walls is normal; assume the back wall is out by 15mm over 3m.
How does the stone actually reach a kitchen in Plumstead?
Steep hillside streets with permit parking and no driveways, plus long flights of front steps on the upper roads — the carry is usually uphill and through the house rather than round the side. Door width, hall width and the diagonal at the turn are three separate measurements, and it is the diagonal that catches people out. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. It sets what the day actually looks like. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.
Is Plumstead mostly worktop replacement work for you?
Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop templating and worktop fabrication. In a converted house the flat entrance and the internal doorway are usually tighter than the communal stairs, and that is easy to overlook. The carcasses have to be sound, because stone is several times the weight of what is coming off. Sound carcasses or it does not go ahead. A kitchen carved out of a larger room sits under whatever the original plan left behind, so the run frequently ends at a blocked doorway or a boxed-in service. The carcasses have to be sound, because stone is several times the weight of what is coming off. A plumber either side of us.
Why do two Plumstead kitchens the same size price differently?
Galley runs are usually short enough to come out of a single slab, so the material band you choose does more to the total than the room shape does. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. Height change is checked before we cut. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What has to be finished before you can template?
A run can measure dead right at both ends and still belly out in the middle, which only appears once the laser plots the intermediate points. We would rather find it at template than on the morning, which is why the templater looks behind the units. Found at template, not on fit day. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Sound carcasses are the condition.
Related
More around Plumstead
Other work we do in Plumstead
Next step
Worktop replacement in Plumstead, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.