Lambeth · SE11
Splashbacks and upstands in Kennington
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
Kennington kitchens
What the kitchens here are actually like
Nothing in a house of this age is square, and the kitchen is usually the part that has been altered most often. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. The wall decides, not the brochure.
Georgian and early Victorian houses have their kitchens at lower-ground level in what were service rooms, so runs follow the original room proportions with a small island or a central table rather than a big open plan. Estate flats nearby have compact separate kitchens with fixed service positions.
Much of the Georgian stock is listed or in a conservation area with a lower-ground entrance down railed area steps that turn sharply at the bottom. Parking is permit-controlled and the northern edge falls close to the congestion charge boundary, so charges need checking by street.
Georgian houses put the kitchen in a basement or a rear closet wing, and the stairs down to it are the tightest part of the whole route. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. Cut from the same slab run as the tops.
What we are usually templating in is Georgian terrace, Early Victorian terrace, Interwar and postwar estate block and Mansion flat. That mix is why two jobs on the same road can run completely differently.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered from the New Malden patch. Fitted 3–7 working days from template.
period detached houses and villas
What gets asked for here
This is not the local speciality and there is no point saying otherwise: worktop templating, worktop replacement and worktop installation is what the housing here actually asks for. It is quoted, cut and fitted exactly the same way regardless.
period detached houses and villas
The building, and what it does to the job
Lower-ground rooms in this stock are damp-prone and rarely flat, so the run needs packing and the floor level checked at both ends before any long piece is cut.
A junction between an original floor and a later extension slab is almost never at the same level, so units carrying a run across it need packing first. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Make the wall good first, or accept the detail.
Access
Getting stone into a Kennington kitchen
Much of the Georgian stock is listed or in a conservation area with a lower-ground entrance down railed area steps that turn sharply at the bottom. Parking is permit-controlled and the northern edge falls close to the congestion charge boundary, so charges need checking by street.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
New Malden patch
Kennington is worked from our New Malden run, covering South West London & Surrey.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in Kennington
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you cover Kennington?
Yes. Kennington is on the patch, and the postcodes we work here are SE11. It is run from the New Malden side, covering South West London & Surrey. Permit hours are what matters, not the permit itself, because a bay that frees up at six in the evening is no use for a template at ten. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. That is why they are crated the way they are. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Does the housing in Kennington change how worktop splashbacks & upstands works?
Listing and conservation conditions apply to a good number of these, which constrains what can be altered around the kitchen rather than what goes on top of the units. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. Cut from the same slab run as the tops. Lower-ground rooms in this stock are damp-prone and rarely flat, so the run needs packing and the floor level checked at both ends before any long piece is cut.
How does the stone actually reach a kitchen in Kennington?
Much of the Georgian stock is listed or in a conservation area with a lower-ground entrance down railed area steps that turn sharply at the bottom. Parking is permit-controlled and the northern edge falls close to the congestion charge boundary, so charges need checking by street. Everything comes through the front door and down the hall, so the tightest point on the route is usually the newel post at the foot of the stairs. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Joint positions follow from that. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.
Is Kennington really a worktop splashbacks & upstands area?
Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop templating, worktop replacement and worktop installation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Siliconed to the worktop, never grouted. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Sockets final before template.
Why do two Kennington kitchens the same size price differently?
If the island is a few hundred millimetres longer than the usable length of a slab, a second slab gets bought to gain that overhang, and the whole slab is paid for rather than the part used. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What has to be finished before you can template?
Legs bottoming out on hard concrete or an uneven screed mean the tops of the carcasses are not one plane, and that is picked up at template rather than on fitting day. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. An upstand rides what a panel exposes. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. These kitchens tend to be compact and reasonably square, so the fixed template, fabrication and fitting lines are a larger share of the total than the stone is. Full-height panels need the wall made good first, which is another trade and another timescale. The wall has to be ready.
Related
More around Kennington
Other work we do in Kennington
Next step
Splashbacks and upstands in Kennington, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.