Skip to content

Hammersmith and Fulham · W6

Splashbacks and upstands in Fulham Reach

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

Fulham Reach kitchens

What the kitchens here are actually like

2010s riverside apartment blockwharf and distillery site redevelopmentconcierge towerriverside townhouse

Plasterboard partitions mean light scribes and clean joins, and the fabrication effort moves to the visible faces instead. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. The wall decides, not the brochure.

Developer kitchens throughout, so you are usually working to a fixed footprint - a run of 3-3.6m against a service wall plus an island of around 2.2m, all sitting over pre-routed services that cannot move.

There is a basement car park with a height barrier and a loading bay, and once out of the lift the corridors are long and carpeted, so boards go down before anything is wheeled. Managed estate with a concierge desk, contractor sign-in, insurance checks and a booked goods lift that has to be protected before use. Upgrades from the original composite tops to full-slab quartz or Dekton are the bread and butter, and the sink cut-out has to match the existing undermount position exactly. Everything is fixed by the developer's services, so this is a precision replacement job - measure the existing undermount and drainage grooves, do not redesign them.

Dot-and-dab plasterboard bellies at a taped internal angle, so the run picks up a few millimetres over the last 300mm and a plan-angle mitre will not close. Every socket, switch and any USB point has to be cut out of the stone to the actual measured position, so the template has to be taken with the faceplates off and the back boxes visible. Decided before fabrication starts.

What we are usually templating in is 2010s riverside apartment block, wharf and distillery site redevelopment, concierge tower and riverside townhouse. The differences between them show up at template, not at enquiry.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered from the New Malden patch. Fitted 3–7 working days from template.

new-build flats and apartments

What gets asked for here

Housings and integrated appliances are set out for a 38mm laminate top, so dropping to 20mm or 30mm stone changes the clearances and needs checking before anything is cut. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Siliconed to the worktop, never grouted.

This is not the local speciality and there is no point saying otherwise: worktop replacement, worktop templating and worktop installation is what the housing here actually asks for. It is quoted, cut and fitted exactly the same way regardless.

Access

Getting stone into a Fulham Reach kitchen

Managed estate with a concierge desk, contractor sign-in, insurance checks and a booked goods lift that has to be protected before use. There is a basement car park with a height barrier and a loading bay, and once out of the lift the corridors are long and carpeted, so boards go down before anything is wheeled.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

New Malden patch

Fulham Reach is worked from our New Malden run, covering South West London & Surrey.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Fulham Reach

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Is Fulham Reach on your patch?

Yes. Fulham Reach is on the patch, and the postcodes we work here are W6. It is run from the New Malden side, covering South West London & Surrey. Bay bookings are usually an hour or two, which is fine for unloading and no use at all as a place to leave the van for a day. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Why would worktop splashbacks & upstands in Fulham Reach be any different from anywhere else?

Piece size is set by the lift car and the entrance dogleg, which routinely turns a two-piece kitchen into a three-piece one. The plasterboard is flat enough for a full-height panel; it is the socket positions that cause the trouble. Cut from the same slab run as the tops. Everything is fixed by the developer's services, so this is a precision replacement job - measure the existing undermount and drainage grooves, do not redesign them.

How would you get a worktop into a property in Fulham Reach?

Managed estate with a concierge desk, contractor sign-in, insurance checks and a booked goods lift that has to be protected before use. There is a basement car park with a height barrier and a loading bay, and once out of the lift the corridors are long and carpeted, so boards go down before anything is wheeled. Sign-in at the gate, a permit on the dash and a named contact are usually wanted before anything comes off the van. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Joint positions follow from that. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.

Is Fulham Reach really a worktop splashbacks & upstands area?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop replacement, worktop templating and worktop installation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Upgrading a builder-finish kitchen is mostly a swap, so the cost sits in the material choice rather than in the shape of the room. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Siliconed to the worktop, never grouted. Housings and integrated appliances are set out for a 38mm laminate top, so dropping to 20mm or 30mm stone changes the clearances and needs checking before anything is cut. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Siliconed to the worktop, never grouted.

What moves the number on a quote around here?

Seating overhangs past roughly 300mm will not carry on the carcass alone, so flat steel bar or a plywood substrate has to be built into the units first. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. The joint to the worktop is siliconed, never grouted. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What needs to be ready before you come to Fulham Reach?

Where a partition has been built off the floor screed rather than off the slab, it moves, and a mitre bonded across that corner is the first thing to open. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Make the wall good first, or accept the detail. Any socket you intend to move must be moved and re-plastered before templating, because a cut-out in the wrong place means a new piece of stone. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. Full-height panels need the wall made good first, which is another trade and another timescale. Same slab run as the tops.

Next step

Splashbacks and upstands in Fulham Reach, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7479 194398