Skip to content

City of London · EC2R EC3V

Splashbacks and upstands in Bank

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

Bank kitchens

What the kitchens here are actually like

banking hall and office building converted to flatsVictorian commercial building with residential upper floorsmodern apartment in a mixed-use schemesmall pied-a-terre flat

The room is square, the walls are plumb and the floor is flat, so almost every complication in the job belongs to the building rather than the kitchen. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Same slab run, same day, same batch.

Conversions of former banking and office buildings give unusual room shapes with very tall ceilings and thick masonry, so kitchens are often an L of 3-3.5m tucked into a corner of a large single room, with the stone chosen to sit against ornate original plasterwork.

Pied-a-terre flats here are used lightly, so the brief is durability and low maintenance rather than a big cooking layout. The Bank junction itself is restricted to buses and cycles during weekday daytime hours, which is the single most important planning fact for a delivery here - the approach has to be worked out from the permitted streets, not the shortest route. Plan the delivery route around the Bank junction restrictions first and the kitchen second, because a wrong turn here is a fine and a missed slot.

Piece size is set by the lift car and the entrance dogleg, which routinely turns a two-piece kitchen into a three-piece one. Every socket, switch and any USB point has to be cut out of the stone to the actual measured position, so the template has to be taken with the faceplates off and the back boxes visible. Decided before fabrication starts.

The stock behind these kitchens runs to banking hall and office building converted to flats, Victorian commercial building with residential upper floors, modern apartment in a mixed-use scheme and small pied-a-terre flat. Which of those you have decides most of what follows.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered from the Essex patch. Fitted 3–7 working days from template.

Victorian and Edwardian terraces

The shape of the run

Where the return runs into a wall that is out of square, the corner is templated as the angle it really is rather than as ninety degrees. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Corners get their own pieces.

Victorian and Edwardian terraces

Getting stone into the room

Add security desks, ANPR on the City's entry points and short loading windows, and an early or late slot is usually the only practical option.

Victorian and Edwardian terraces

What gets asked for here

Honestly, this is not what we do most on this patch. Worktop replacement, worktop installation and worktop design & quotation come up more often. That is a statement about the local housing rather than about the work, and nothing about how it is quoted, cut or fitted changes because of it.

Access

Getting stone into a Bank kitchen

The Bank junction itself is restricted to buses and cycles during weekday daytime hours, which is the single most important planning fact for a delivery here - the approach has to be worked out from the permitted streets, not the shortest route. Add security desks, ANPR on the City's entry points and short loading windows, and an early or late slot is usually the only practical option.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

Essex patch

Bank is worked from our Essex run, covering Essex & East London.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Bank

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you actually work in Bank, or just list it?

Yes. Bank is on the patch, and the postcodes we work here are EC2R, EC3V. It is run from the Essex side, covering Essex & East London. Underground loading has a height restriction, and a van with an A-frame on it is taller than the driver remembers. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

What is different about worktop splashbacks & upstands in Bank?

Boxed soil stacks and ventilation ducts run behind the units, and the boxing depth changes between floor level and worktop height. Every socket, switch and any USB point has to be cut out of the stone to the actual measured position, so the template has to be taken with the faceplates off and the back boxes visible. Decided before fabrication starts. Plan the delivery route around the Bank junction restrictions first and the kitchen second, because a wrong turn here is a fine and a missed slot.

Is access a problem in Bank?

The Bank junction itself is restricted to buses and cycles during weekday daytime hours, which is the single most important planning fact for a delivery here - the approach has to be worked out from the permitted streets, not the shortest route. Add security desks, ANPR on the City's entry points and short loading windows, and an early or late slot is usually the only practical option. Where the parking court sits behind the block the carry crosses open ground and gets boarded, because loaded trolleys and block paving do not agree. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. That is agreed at template, not on fitting day. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.

Do you get much worktop splashbacks & upstands work in Bank?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop replacement, worktop installation and worktop design & quotation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Conversions put kitchens where the services could be made to reach rather than where they belong, so runs are short and interrupted. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Same batch, same run, same day. A kitchen carved out of a larger room sits under whatever the original plan left behind, so the run frequently ends at a blocked doorway or a boxed-in service. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Siliconed to the worktop, never grouted.

What decides the price of a worktop in Bank?

An L can be mitred at the corner for a continuous look or butt-jointed over the gable, and the two are different money and different risk. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Corners get their own pieces. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What do I need to sort out first?

Where a partition has been built off the floor screed rather than off the slab, it moves, and a mitre bonded across that corner is the first thing to open. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. An upstand rides what a panel exposes. Any socket you intend to move must be moved and re-plastered before templating, because a cut-out in the wrong place means a new piece of stone. The same building type can arrive as a careful one-off kitchen or as a fast turnaround, and the honest answer is that they are priced differently. Splashbacks are cut from the same slab run as the tops, so they have to be decided before fabrication, not after. The wall has to be ready.

Next step

Splashbacks and upstands in Bank, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7479 194398