City of Westminster · W1D W1F
Splashbacks and upstands in Soho
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
Soho kitchens
What the kitchens here are actually like
The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Siliconed to the top, never grouted.
Small flats above bars, restaurants and shops with kitchens under 2.5m of run, often in a room with a sloping ceiling on the top floor.
Compact appliances, slimline dishwashers, and worktop depths cut down to 550mm to keep a walkway are routine. Night-time economy means the working window is genuinely 8am to lunchtime.
Rooms are tall with deep window reveals, and a run finishing into a reveal is templated to it rather than assumed square. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. Cut from the same slab run as the tops.
What we are usually templating in is 18th-century walk-up house, flat above restaurant and warehouse-style conversion. The differences between them show up at template, not at enquiry.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered from the Watford patch. Fitted 3–7 working days from template.
Victorian and Edwardian terraces
Getting stone into the room
The hardest access in the borough. No parking at all, pedestrianised sections, servicing windows that clash with restaurant deliveries, and 18th-century houses with 700mm doors and steep dogleg stairs with winders and no landing.
Victorian and Edwardian terraces
What gets asked for here
Honestly, this is not what we do most on this patch. Worktop templating, worktop installation and worktop replacement come up more often. That is a statement about the local housing rather than about the work, and nothing about how it is quoted, cut or fitted changes because of it.
Victorian and Edwardian terraces
The building, and what it does to the job
Winder stairs in these old houses mean the maximum piece that will physically turn is often around 1.8m - design the joints for the staircase first and the kitchen second.
Victorian and Edwardian terraces
The shape of the run
A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. The joint to the worktop is siliconed, never grouted.
Access
Getting stone into a Soho kitchen
The hardest access in the borough. No parking at all, pedestrianised sections, servicing windows that clash with restaurant deliveries, and 18th-century houses with 700mm doors and steep dogleg stairs with winders and no landing. Night-time economy means the working window is genuinely 8am to lunchtime.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
Watford patch
Soho is worked from our Watford run, covering Hertfordshire & North London.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in Soho
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you cover Soho?
Yes. Soho is on the patch, and the postcodes we work here are W1D, W1F. It is run from the Watford side, covering Hertfordshire & North London. A red route means no stopping, and no stopping means exactly that, so the stone comes in from a side street or from a bay behind the property. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. One trip is always better than three. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Does the housing in Soho change how worktop splashbacks & upstands works?
Listing and conservation conditions apply to a good number of these, which constrains what can be altered around the kitchen rather than what goes on top of the units. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. Cut from the same slab run as the tops. Winder stairs in these old houses mean the maximum piece that will physically turn is often around 1.8m - design the joints for the staircase first and the kitchen second.
How does the stone actually reach a kitchen in Soho?
The hardest access in the borough. No parking at all, pedestrianised sections, servicing windows that clash with restaurant deliveries, and 18th-century houses with 700mm doors and steep dogleg stairs with winders and no landing. Night-time economy means the working window is genuinely 8am to lunchtime. Stone goes up on edge, and it is the half-landing turn rather than the flight itself that sets the maximum piece. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Joint positions follow from that. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.
Is Soho really a worktop splashbacks & upstands area?
Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop templating, worktop installation and worktop replacement. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. A kitchen carved out of a larger room sits under whatever the original plan left behind, so the run frequently ends at a blocked doorway or a boxed-in service. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Sockets final before template. Party-wall and lease conditions in a converted building set when noisy work can happen, which shapes the fitting day more than the kitchen does. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Same batch, same run, same day.
Why do two Soho kitchens the same size price differently?
A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. The joint to the worktop is siliconed, never grouted. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What has to be finished before you can template?
Window boards and cills stand proud of the plaster, so the back edge of the top has to be plotted to where the units actually sit rather than to the wall. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Scribed, dubbed out, or set proud. Pick one. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. A street with houses in single occupation next to the same houses cut into flats produces two completely different jobs from the same elevation. Splashbacks are cut from the same slab run as the tops, so they have to be decided before fabrication, not after. Decided before fabrication, not after.
Related
More around Soho
Other work we do in Soho
Next step
Splashbacks and upstands in Soho, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.