City of Westminster · W1J W1K W1S
Kitchen worktops in Mayfair
Two distinct jobs - grand flats where the kitchen is a small back-of-house room the owners never intended to be seen, and lateral conversions where two flats have been knocked together and the kitchen becomes a designed room with book-matched marble, a 3m island and a hidden prep pantry behind it. Specs come from an interior designer with a drawing, not from the client.
The housing stock
What we are usually working with in Mayfair
Two distinct jobs - grand flats where the kitchen is a small back-of-house room the owners never intended to be seen, and lateral conversions where two flats have been knocked together and the kitchen becomes a designed room with book-matched marble, a 3m island and a hidden prep pantry behind it. Specs come from an interior designer with a drawing, not from the client.
Deliveries are frequently routed through the mews at the back on a permit. Estate freeholders impose alteration consents and works hours, the buildings are listed so nothing gets fixed to original fabric without approval, and the lifts in period blocks are small original cars that will not take a slab. Marble here is specified by the designer and it stains - get the client to sign off on sealing and expected patina before you fabricate, because the complaint always comes later.
The buildings themselves are mostly Georgian townhouse, listed mansion flat, lateral apartment conversion and mews house. They are not interchangeable, and a worktop finds the differences quickly.
Wide doors, generous rooms and somewhere to park mean the joins that go in are the ones we choose, not the ones the building forces. Two to three hours on site with a laser, once the units are fitted, fixed and level. The room as it is, to the millimetre.
Original joinery is deep and stands proud of the plaster, so the run is plotted to the units rather than to the wall behind them. An island a few hundred millimetres over the usable slab length costs a whole second slab, which is worth knowing before the layout is fixed. That is what the itemised lines are for.
An island is a single visible piece with four finished edges and no wall to hide against, so it is the piece the whole kitchen is judged on. Pieces are dry-assembled on the bench before dispatch so the corners are known to close before they leave the workshop. The bench proves it before the van does.
Access. Estate freeholders impose alteration consents and works hours, the buildings are listed so nothing gets fixed to original fabric without approval, and the lifts in period blocks are small original cars that will not take a slab. Deliveries are frequently routed through the mews at the back on a permit.
At a glance
- Borough
- City of Westminster
- Postcodes
- W1J, W1K, W1S
- Covered from
- Watford patch
- Lead time
- 3–7 working days from template
There is nothing to visit in Mayfair. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.
Services
What we do in Mayfair
Six services, ordered by what Mayfair's housing stock actually asks for most.
Nearby
We also work around Mayfair
Questions
Working in Mayfair
Do you fit kitchen worktops in Mayfair?
Yes. Two distinct jobs - grand flats where the kitchen is a small back-of-house room the owners never intended to be seen, and lateral conversions where two flats have been knocked together and the kitchen becomes a designed room with book-matched marble, a 3m island and a hidden prep pantry behind it. Specs come from an interior designer with a drawing, not from the client. Without a bay the van ends up on a single yellow with a crew member watching it, which takes a pair of hands off the carry. A templater circling for a space arrives late into a slot that was already tight, and the drawing is what suffers. It goes on the job sheet for the fitting crew.
What kind of kitchens do you usually work on in Mayfair?
Georgian townhouse, listed mansion flat, lateral apartment conversion and mews house. Original joinery is deep and stands proud of the plaster, so the run is plotted to the units rather than to the wall behind them. An island a few hundred millimetres over the usable slab length costs a whole second slab, which is worth knowing before the layout is fixed. That is what the itemised lines are for.
Is access difficult in Mayfair?
Estate freeholders impose alteration consents and works hours, the buildings are listed so nothing gets fixed to original fabric without approval, and the lifts in period blocks are small original cars that will not take a slab. Deliveries are frequently routed through the mews at the back on a permit. Where the lift will not take the longest run we design a join in rather than gamble, because a piece that will not go up has to go back on the van. An access-driven join is priced like any other join, and people are always surprised to see one on a dead straight run. You see that figure before we template, not after.
What do you get asked for most in Mayfair?
Worktop design & quotation, worktop fabrication and worktop templating, in that order. In a converted house the flat entrance and the internal doorway are usually tighter than the communal stairs, and that is easy to overlook. No stone is ever cut from a plan, which is inconvenient exactly when a programme is tight. The room as it is, not as it was drawn. Marble here is specified by the designer and it stains - get the client to sign off on sealing and expected patina before you fabricate, because the complaint always comes later.
What decides the price of a worktop in Mayfair?
An island is a single visible piece with four finished edges and no wall to hide against, so it is the piece the whole kitchen is judged on. Pieces are dry-assembled on the bench before dispatch so the corners are known to close before they leave the workshop. The bench proves it before the van does. The returns into a breast recess are the tightest scribes in the room, and they are eased in rather than forced. This is the item most often left out of a cheaper quote, and it comes back as a variation once the templater has been. Better on the quote than in a variation. Material runs from £110 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines rather than rolled into one figure.
Do you work in flats and leasehold properties in Mayfair?
An owner living in the house makes the decisions and lives with them, so the specification tends to go towards the material rather than towards the lowest total. The template happens when the units are in, fixed and level, whoever is fitting them. No stone is cut from a plan. Tell us the building when you book and the lift, the stair turn and any freeholder notice get built into the day rather than found on it.
Next step
Get your Mayfair kitchen priced
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.