Skip to content

Barking and Dagenham · RM6

Splashbacks and upstands in Marks Gate

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

Marks Gate kitchens

What the kitchens here are actually like

1950s LCC estate housepost-war maisonette1960s low-rise flat

The carry is the constraint: a single stair with tight half-landings, or deck access with a long walk from the lift. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Same slab run, same day, same batch.

A compact post-war estate cut off north of the A12, built to a small number of types, so kitchens are uniformly small — a single 2.4m run with the boiler above and no realistic room for an island or peninsula unless a wall comes out. Most work is replacement tops and sinks on sound units, with occasional full refits where a rear extension has been added.

Self-contained estate with parking courts, garage blocks and pedestrian paths between the blocks; the A12 means there is one way in and out, so timing around traffic matters.

Walls are dense block or in-situ concrete with a bonded plaster, so the bottom course of tiles brings plaster with it when the old top comes off. Dense concrete takes adhesive better than fixings, which actually suits a large bonded panel. Decided before fabrication starts.

The buildings themselves are mostly 1950s LCC estate house, post-war maisonette and 1960s low-rise flat. A quote that ignores which one you have is guessing.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered from the Essex patch. Fitted 3–7 working days from template.

ex-local-authority flats and estates

The building, and what it does to the job

The estate is small and repetitive, so once we have templated one of each house type we know the room, but every single one still gets checked for the boiler position.

ex-local-authority flats and estates

What gets asked for here

It is on the shortlist for this patch rather than at the top of it, because worktop replacement comes up more often. Nothing about the process differs between the two.

ex-local-authority flats and estates

The shape of the run

The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. The joint to the worktop is siliconed, never grouted.

Access

Getting stone into a Marks Gate kitchen

Self-contained estate with parking courts, garage blocks and pedestrian paths between the blocks; the A12 means there is one way in and out, so timing around traffic matters.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

Essex patch

Marks Gate is worked from our Essex run, covering Essex & East London.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Marks Gate

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Is Marks Gate on your patch?

Yes. Marks Gate is on the patch, and the postcodes we work here are RM6. It is run from the Essex side, covering Essex & East London. Gravel and block paving both look like hard standing and neither takes a loaded trolley, so the run from tail lift to door gets boarded. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. One trip is always better than three. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Why would worktop splashbacks & upstands in Marks Gate be any different from anywhere else?

An ex-council house is solidly built to a standard plan, with the kitchen at the rear and a back door next to it. The rear kitchen wall in ex-council flats and maisonettes is commonly dense in-situ concrete or blockwork with a thin skim, which means mechanical fixings are hard work and the splashback is held on adhesive rather than screwed. Cut from the same slab run as the tops. The estate is small and repetitive, so once we have templated one of each house type we know the room, but every single one still gets checked for the boiler position.

How would you get a worktop into a property in Marks Gate?

Self-contained estate with parking courts, garage blocks and pedestrian paths between the blocks; the A12 means there is one way in and out, so timing around traffic matters. The barrier, the entry code and the estate rules decide when a van can get near the door, and none of that is negotiable on the day. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Joint positions follow from that. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.

Do you do much worktop splashbacks & upstands around Marks Gate?

It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Same batch, same run, same day. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Sockets final before template.

What moves the number on a quote around here?

The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Corners get their own pieces. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What needs to be ready before you come to Marks Gate?

Anything that has to stay accessible, a stopcock, a gas meter, a riser panel, is marked on the template so the stone is cut around it instead of over it. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Make the wall good first, or accept the detail. Any surface trunking or conduit has to be rerouted or accepted and boxed before templating, because the stone cannot be scribed around a live conduit on site. A street with houses in single occupation next to the same houses cut into flats produces two completely different jobs from the same elevation. Full-height panels need the wall made good first, which is another trade and another timescale. The wall has to be ready.

Next step

Splashbacks and upstands in Marks Gate, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7479 194398