Skip to content

Kensington and Chelsea · W8

Worktop templating in Kensington

A digital template plotting the room as it really is, taken once your units are fitted, fixed and level.

Kensington kitchens

What the kitchens here are actually like

Georgian and early Victorian townhousered-brick Queen Anne revival terraceEdwardian mansion blocklateral conversion flat

Nothing in a house of this age is square, and the kitchen is usually the part that has been altered most often. Two to three hours on site with a laser, once the units are fitted, fixed and level. Sink, tap and hob on site, not on order.

Get the porter's lift dimensions and permitted hours in writing before you order, because a block that only allows deliveries 10am to 4pm turns a one-day install into two. Two dominant jobs: townhouses off the High Street with the kitchen in the lower ground and a light shaft or vault at the front, and mansion flats where two flats have been laterally joined and the kitchen has been moved from the old rear service position into the middle of the plan with a 2.8-3.4m island. Lateral flats also throw up long uninterrupted runs against a structural wall, sometimes 4m plus, which is where joint placement earns its money. Measure the lift car diagonally including the ceiling height, because a 3m slab only goes in a small lift if it can be stood on edge and tilted, and many of these cars have low soffits.

Rooms are tall with deep window reveals, and a run finishing into a reveal is templated to it rather than assumed square. Alcoves either side of the breast are rarely the same width and rarely parallel, so each one is templated as its own piece with its own scribe. Two to three hours, once the units are in.

On these streets the housing is Georgian and early Victorian townhouse, red-brick Queen Anne revival terrace, Edwardian mansion block and lateral conversion flat. The differences between them show up at template, not at enquiry.

True everywhere

Worktop templating, in short

  • Two to three hours on site for a typical kitchen.
  • Units must be fitted, fixed and level first. No stone is ever cut from a plan.
  • Sink, tap and hob must be physically on site, not just ordered.
  • A Belfast or butler sink must be installed and at its final height.

Covered from the New Malden patch. Fitted 3–7 working days from template.

period detached houses and villas

Getting stone into the room

Mansion blocks are the constraint - porters control the goods entrance, works are usually restricted to weekday mid-morning to mid-afternoon, and the service lift is the only one you are allowed to use with materials.

Where the lift will not take the longest run we design a join in rather than gamble, because a piece that will not go up has to go back on the van. A template taken without walking the route produces a drawing that cuts beautifully and will not go in. It goes on the drawing with the run dimensions.

period detached houses and villas

What gets asked for here

Second or third on the list around here, after worktop design & quotation. Same visit, same bench, same crew, same lead time.

period detached houses and villas

The building, and what it does to the job

Where the side return has been filled in, the old external wall is now an internal one and still carries its render, its gutter line and its old fixings. The laser plots the bow along the back of the run, which is why a tape reading taken beforehand never matches. Recorded as it is, not as it was drawn.

Access

Getting stone into a Kensington kitchen

Mansion blocks are the constraint - porters control the goods entrance, works are usually restricted to weekday mid-morning to mid-afternoon, and the service lift is the only one you are allowed to use with materials. Measure the lift car diagonally including the ceiling height, because a 3m slab only goes in a small lift if it can be stood on edge and tilted, and many of these cars have low soffits.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

New Malden patch

Kensington is worked from our New Malden run, covering South West London & Surrey.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop templating in Kensington

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Kensington?

Yes. Kensington is on the patch, and the postcodes we work here are W8. It is run from the New Malden side, covering South West London & Surrey. Underground loading has a height restriction, and a van with an A-frame on it is taller than the driver remembers. A templater circling for a space arrives late into a slot that was already tight, and the drawing is what suffers. The templater needs a proper stop, not a pause. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in Kensington change how worktop templating works?

Georgian houses put the kitchen in a basement or a rear closet wing, and the stairs down to it are the tightest part of the whole route. Alcoves either side of the breast are rarely the same width and rarely parallel, so each one is templated as its own piece with its own scribe. No stone is ever cut from a plan. Get the porter's lift dimensions and permitted hours in writing before you order, because a block that only allows deliveries 10am to 4pm turns a one-day install into two.

How does the stone actually reach a kitchen in Kensington?

Mansion blocks are the constraint - porters control the goods entrance, works are usually restricted to weekday mid-morning to mid-afternoon, and the service lift is the only one you are allowed to use with materials. Measure the lift car diagonally including the ceiling height, because a 3m slab only goes in a small lift if it can be stood on edge and tilted, and many of these cars have low soffits. Piece length is set by the internal diagonal of the lift car, not by the length of the slab. Door widths, turn diagonals and any change of level are recorded on the drawing alongside the run dimensions. That is part of what the visit is for. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.

Is worktop templating common in Kensington?

It is one of the three we do most here, behind worktop design & quotation. Same template visit, same workshop, same installers either way. In a converted house the flat entrance and the internal doorway are usually tighter than the communal stairs, and that is easy to overlook. Two to three hours on site, with the sink, tap and hob physically present. Appliances on site, not on order. Conversions put kitchens where the services could be made to reach rather than where they belong, so runs are short and interrupted. No stone is ever cut from a plan, which is inconvenient exactly when a programme is tight. Appliances on site, not on order.

Why do two Kensington kitchens the same size price differently?

Seating overhangs past roughly 300mm will not carry on the carcass alone, so flat steel bar or a plywood substrate has to be built into the units first. Join positions and vein direction are marked on the template drawing before it leaves site. The drawing leaves site complete. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

Where a corner is a couple of degrees off, a mitre cut to a theoretical ninety degrees opens on the wall side and there is no closing it afterwards. The laser plots it as it is, at the exact height the worktop will sit, and the drawing carries that through. Plotted, not estimated. Units fixed and packed level over the sloping floor, walls replastered and dry at their final thickness (tiling and splashbacks go on after the worktop, never before), and the sink, tap and hob physically on site, with a Belfast sink built in and set at its finished height. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. A template booked hopefully around another trade is the commonest cause of a wasted visit. No stone is cut from a plan.

Next step

Worktop templating in Kensington, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7479 194398