Newham · E16
Worktop replacement in Custom House
Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.
Custom House kitchens
What the kitchens here are actually like
These kitchens have usually been retiled twice and knocked through once, and both of those leave marks the worktop has to deal with. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. A single day, planned properly.
Older terraces and council houses have small rear kitchens of around 2.2m to 2.6m with a pantry recess and a back door in the run. New replacement blocks have single-wall open-plan kitchens, so the work is either a small traditional refit or a like-for-like swap in a modern flat.
Site hoardings regularly block the road you templated from, so leave a bit of slack in the delivery window for a diverted approach. Ongoing regeneration means hoardings, closed roads and diverted footways that change month to month, so the route needs checking on the day rather than from a map. Where houses survive there is decent kerb space and level front access, which makes those the straightforward jobs.
Original quarry-tiled floors sit lower than a later screed, so a run crossing that junction needs the units packed to one level. The kitchen is normally the original back room with a later side-return or rear extension bolted on, and that helps us: most pieces can go down the side alley and in through the back door in one length, so we can avoid joins that a front-door route would force. Sound carcasses are the one condition.
On these streets the housing is interwar terrace, post-war council housing and recent regeneration apartment. The differences between them show up at template, not at enquiry.
True everywhere
Worktop replacement, in short
- The units stay. Only the surface changes.
- Old tops come out in the morning, new stone is down and sealed the same day.
- A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
- The carcasses have to be sound: stone is far heavier than laminate.
Covered from the Essex patch. Fitted 3–7 working days from template.
1930s and inter-war semis
Getting stone into the room
Underground loading has a height restriction, and a van with an A-frame on it is taller than the driver remembers. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. It is a full day at the kerb, not a delivery.
1930s and inter-war semis
What gets asked for here
This is the job the local stock asks for first, ahead of worktop templating and worktop installation.
Access
Getting stone into a Custom House kitchen
Ongoing regeneration means hoardings, closed roads and diverted footways that change month to month, so the route needs checking on the day rather than from a map. Where houses survive there is decent kerb space and level front access, which makes those the straightforward jobs.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
Essex patch
Custom House is worked from our Essex run, covering Essex & East London.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop replacement in Custom House
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Is Custom House on your patch?
Yes. Custom House is on the patch, and the postcodes we work here are E16. It is run from the Essex side, covering Essex & East London. Bay bookings are usually an hour or two, which is fine for unloading and no use at all as a place to leave the van for a day. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. Old tops out and new stone in, both through the same gap. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Why would worktop replacement in Custom House be any different from anywhere else?
The back door frequently opens straight into the kitchen, which is the best carry route in the house and the one people forget to mention. What catches people out is the junction between the old floor and the extension floor, which is rarely at the same level, so a run carrying across it needs the units packed before stone goes on. Units kept, surface changed, one day. Site hoardings regularly block the road you templated from, so leave a bit of slack in the delivery window for a diverted approach.
How would you get a worktop into a property in Custom House?
Ongoing regeneration means hoardings, closed roads and diverted footways that change month to month, so the route needs checking on the day rather than from a map. Where houses survive there is decent kerb space and level front access, which makes those the straightforward jobs. Where the van stands level with the front of the house a piece gets handled twice instead of five times, and stone breaks on handling rather than on the road. We plan the strip-out and the carry as one movement so the kitchen is only out of use for a single day. That is agreed before a plumber is booked. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.
Is worktop replacement the job you do most in Custom House?
Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop templating and worktop installation. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Old tops out in the morning, new stone down and sealed the same afternoon. Sound carcasses or it does not go ahead. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. The carcasses have to be sound, because stone is several times the weight of what is coming off. Sound carcasses or it does not go ahead.
What moves the number on a quote around here?
A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. Going from a 38mm laminate to 20mm or 30mm stone drops the surface, which shows against tiles, a window board and any freestanding appliance. Height change is checked before we cut. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What needs to be ready before you come to Custom House?
Alcove pieces get cut oversize on both scribe edges, with the true wall angles carried on the template drawing rather than assumed. This is the commonest reason a replacement turns out to need more than a straight swap. The laminate has been covering it up. Unlock the side gate and clear the alley of bins, bikes and pots, and arrange a plumber for the sink and an electrician if the hob is hard-wired. Where a landlord or housing provider is involved there is a specification to meet and a process to follow, and both are settled before a date is offered. A plumber disconnects before we arrive and reconnects after we leave, and that is worth booking early. Sound carcasses are the condition.
Related
More around Custom House
Other work we do in Custom House
Next step
Worktop replacement in Custom House, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.