Greenwich · SE9
Worktop templating in Coldharbour
A digital template plotting the room as it really is, taken once your units are fitted, fixed and level.
Coldharbour kitchens
What the kitchens here are actually like
The carry is the constraint: a single stair with tight half-landings, or deck access with a long walk from the lift. No stone is ever cut from a plan, which is why the visit happens after the units are in and not before. Sink, tap and hob on site, not on order.
Postwar estate housing with small kitchens planned around a fixed sink under the window and a boiler cupboard; runs are 2m to 2.6m and worktops are usually replaced piecemeal rather than as part of a redesign.
Walls are dense block or in-situ concrete with a bonded plaster, so the bottom course of tiles brings plaster with it when the old top comes off. Carcass heights are read individually, since legs bottoming out on concrete mean the units do not share one plane. Two to three hours, once the units are in.
The buildings themselves are mostly postwar LCC estate, 1950s-60s maisonette block and 1970s terrace. Which of those you have decides most of what follows.
True everywhere
Worktop templating, in short
- Two to three hours on site for a typical kitchen.
- Units must be fitted, fixed and level first. No stone is ever cut from a plan.
- Sink, tap and hob must be physically on site, not just ordered.
- A Belfast or butler sink must be installed and at its final height.
Covered from the New Malden patch. Fitted 3–7 working days from template.
ex-local-authority flats and estates
The building, and what it does to the job
Those stair turns on the maisonettes cap the piece length — measure the turn, not just the doorway.
ex-local-authority flats and estates
Getting stone into the room
Estate layout with parking courts and rear footpaths, and several maisonette blocks reached by an external stair with a tight turn at the top.
A walk-up with winders at every half-landing means the piece is rested and re-gripped on the way, so the crew size goes up before the piece size comes down. Door widths, turn diagonals and any change of level are recorded on the drawing alongside the run dimensions. That is part of what the visit is for.
ex-local-authority flats and estates
What gets asked for here
Managed stock usually comes with its own rules about working hours, waste, and who is allowed on site. A template booked hopefully around another trade is the commonest cause of a wasted visit. No stone is cut from a plan.
This is one of the three jobs that come up most here, behind worktop replacement. It is the same template visit, the same workshop and the same installers either way.
ex-local-authority flats and estates
True everywhere, stated once
A template records what the building actually did, not what the plan intended. How far those two things diverge is entirely a function of when the house was built.
Access
Getting stone into a Coldharbour kitchen
Estate layout with parking courts and rear footpaths, and several maisonette blocks reached by an external stair with a tight turn at the top.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
New Malden patch
Coldharbour is worked from our New Malden run, covering South West London & Surrey.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop templating in Coldharbour
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Is Coldharbour on your patch?
Yes. Coldharbour is on the patch, and the postcodes we work here are SE9. It is run from the New Malden side, covering South West London & Surrey. Unrestricted kerbside is straightforward as long as the space in front of the property is actually clear when the van arrives. The templating visit needs somewhere to stop for two or three hours, which is a different problem from unloading for twenty minutes. Two hours is the realistic figure. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Why would worktop templating in Coldharbour be any different from anywhere else?
Walls are dense block or in-situ concrete with a bonded plaster, so the bottom course of tiles brings plaster with it when the old top comes off. Concrete and dense block walls in ex-council stock cannot be chased back or packed out to suit, so the template takes the wall exactly as it is and the stone carries the scribe. No stone is ever cut from a plan. Those stair turns on the maisonettes cap the piece length — measure the turn, not just the doorway.
How would you get a worktop into a property in Coldharbour?
Estate layout with parking courts and rear footpaths, and several maisonette blocks reached by an external stair with a tight turn at the top. Communal stairs get boarded and the handrail padded, and we walk the route with a tape before the first piece leaves the van. A template taken without walking the route produces a drawing that cuts beautifully and will not go in. That is part of what the visit is for. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.
Do you do much worktop templating around Coldharbour?
It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. Quartz suits let property well: no sealing, no annual maintenance, and nothing an incoming tenant has to be told to look after. No stone is ever cut from a plan, which is inconvenient exactly when a programme is tight. Units fitted, fixed and level first. A worktop replacement between tenancies is a single-day job by design, because the flat is not earning while it is empty. The template visit is booked once the units are genuinely in, not when they are nearly in. Appliances on site, not on order.
What moves the number on a quote around here?
Galley runs are usually short enough to come out of a single slab, so the material band you choose does more to the total than the room shape does. A layout templated off one wall instead of one datum will not sit right once all the pieces are down together. Real angles, not plan angles. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What needs to be ready before you come to Coldharbour?
A notch around a boxed stack is machined with a radius at the internal corner, because a square inside corner there is exactly where a top will crack. The laser plots it as it is, at the exact height the worktop will sit, and the drawing carries that through. That is why the visit takes two or three hours. Every base unit fixed to the wall, packed and levelled with the laser, and any dry-lining or patching completed - the template reads the wall face it is given, so that has to be the finished face. Managed stock usually comes with its own rules about working hours, waste, and who is allowed on site. The template happens when the units are in, fixed and level, whoever is fitting them. Fitted, fixed and level, then we come.
Related
More around Coldharbour
Other work we do in Coldharbour
Next step
Worktop templating in Coldharbour, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.