Merton · SW20
Splashbacks and upstands in Cannon Hill
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
Cannon Hill kitchens
What the kitchens here are actually like
Units are often only 500mm deep, so a standard 600mm stone top overhangs at the front and the doors need checking against it. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. Same slab run, same day, same batch.
The 1960s low-rise blocks have compact fitted kitchens where a single 2.4m run and a return is the whole job.
Houses backing onto the common have kitchens reorientated to face the green, often with a peninsula under a rear window rather than a full extension. Roads bordering the common are quiet but have limited turning space and grass verges that a loaded van will sink into after rain.
The window sits in the middle of the run over the sink, and its board and cill set the limit on how tall an upstand can be. That step is exactly what an upstand covers and what a full-height panel exposes, so unless the wall is skimmed level end to end, a 100mm band is the reliable choice. Cut from the same slab run as the tops.
On these streets the housing is 1930s semi, 1960s low-rise flat and Postwar detached. That mix is why two jobs on the same road can run completely differently.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered from the New Malden patch. Fitted 3–7 working days from template.
1930s and inter-war semis
Getting stone into the room
Flats in the low-rise blocks are reached by external stairs with an open landing, which makes wind a genuine handling issue with a slab on edge.
1930s and inter-war semis
What gets asked for here
Second or third on the list around here, after worktop replacement. Same visit, same bench, same crew, same lead time.
1930s and inter-war semis
The building, and what it does to the job
In the flats the window sill often sits lower than the worktop line, so a sill-height check has to happen before the sink run is cut.
Where a run finishes into a reveal, the depth of that reveal is taken at worktop height and nowhere else. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. An upstand rides what a panel exposes.
Access
Getting stone into a Cannon Hill kitchen
Roads bordering the common are quiet but have limited turning space and grass verges that a loaded van will sink into after rain. Flats in the low-rise blocks are reached by external stairs with an open landing, which makes wind a genuine handling issue with a slab on edge.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
New Malden patch
Cannon Hill is worked from our New Malden run, covering South West London & Surrey.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in Cannon Hill
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you actually work in Cannon Hill, or just list it?
Yes. Cannon Hill is on the patch, and the postcodes we work here are SW20. It is run from the New Malden side, covering South West London & Surrey. Where the van can pull up level with the gate the pieces are handled the fewest times, which is what actually protects them. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. That is why they are crated the way they are. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
What is different about worktop splashbacks & upstands in Cannon Hill?
Post-war terraces have a short straight hall to the kitchen, which is a good deal kinder than the houses they replaced. That step is exactly what an upstand covers and what a full-height panel exposes, so unless the wall is skimmed level end to end, a 100mm band is the reliable choice. The wall makes that decision, not the brochure. In the flats the window sill often sits lower than the worktop line, so a sill-height check has to happen before the sink run is cut.
Is access a problem in Cannon Hill?
Roads bordering the common are quiet but have limited turning space and grass verges that a loaded van will sink into after rain. Flats in the low-rise blocks are reached by external stairs with an open landing, which makes wind a genuine handling issue with a slab on edge. Communal stairs get boarded and the handrail padded, and we walk the route with a tape before the first piece leaves the van. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Joint positions follow from that. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.
Is worktop splashbacks & upstands common in Cannon Hill?
It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Same batch, same run, same day. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Siliconed to the worktop, never grouted.
What decides the price of a worktop in Cannon Hill?
A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What do I need to sort out first?
Sill height gets settled with the template on site, because it is one of the few dimensions nobody has measured before we arrive. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Scribed, dubbed out, or set proud. Pick one. Boiler position, flue and any pipework drops must be settled and the wall skimmed level before templating the splashback run. An owner living in the house makes the decisions and lives with them, so the specification tends to go towards the material rather than towards the lowest total. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. The wall has to be ready.
Related
More around Cannon Hill
Other work we do in Cannon Hill
Next step
Splashbacks and upstands in Cannon Hill, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.