Wandsworth · SW11
Worktop templating in Between the Commons
A digital template plotting the room as it really is, taken once your units are fitted, fixed and level.
Between the Commons kitchens
What the kitchens here are actually like
The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. Two to three hours on site with a laser, once the units are fitted, fixed and level. Units fitted, fixed and level first.
This is the densest concentration of side-return and full-width rear extensions in the borough — the alley is infilled, the rear wall is pushed back, and the result is a 4m to 5m wide kitchen with a long run plus a 2.4m to 3m island under a flat rooflight. Islands almost always carry a hob and a mitred end panel.
The island is the whole job here — get the exact spine position and the overhang for stools agreed on site before templating, because clients change their mind about seating after the units land.
A long piece has to come through the front door, down the hall, round the newel post and through a doorway with a step down into the addition. The laser plots the bow along the back of the run, which is why a tape reading taken beforehand never matches. Two to three hours, once the units are in.
The stock behind these kitchens runs to Late Victorian terrace and Edwardian terrace. Which of those you have decides most of what follows.
True everywhere
Worktop templating, in short
- Two to three hours on site for a typical kitchen.
- Units must be fitted, fixed and level first. No stone is ever cut from a plan.
- Sink, tap and hob must be physically on site, not just ordered.
- A Belfast or butler sink must be installed and at its final height.
Covered from the New Malden patch. Fitted 3–7 working days from template.
Victorian and Edwardian terraces
The shape of the run
An island is a single visible piece with four finished edges and no wall to hide against, so it is the piece the whole kitchen is judged on. The template records every angle in that shape as it actually is rather than as the plan drew it. Real angles, not plan angles.
Victorian and Edwardian terraces
Getting stone into the room
Uniform terraces with small front gardens, permit-only parking that is full by 9am, and no vehicle access to the rear at all. Everything goes down the hallway past the stairs, and the hall width of roughly 950mm sets the maximum slab width that can be turned.
Victorian and Edwardian terraces
What gets asked for here
This is one of the three jobs that come up most here, behind worktop design & quotation. It is the same template visit, the same workshop and the same installers either way.
Access
Getting stone into a Between the Commons kitchen
Uniform terraces with small front gardens, permit-only parking that is full by 9am, and no vehicle access to the rear at all. Everything goes down the hallway past the stairs, and the hall width of roughly 950mm sets the maximum slab width that can be turned.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
New Malden patch
Between the Commons is worked from our New Malden run, covering South West London & Surrey.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop templating in Between the Commons
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Is Between the Commons on your patch?
Yes. Between the Commons is on the patch, and the postcodes we work here are SW11. It is run from the New Malden side, covering South West London & Surrey. Loading exemptions on red routes are narrow, time-limited and heavily camera-enforced, so we plan around them rather than relying on them. It is noted on the job sheet at template so the fitting crew inherit the answer rather than rediscovering it. It goes on the job sheet for the fitting crew. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Why would worktop templating in Between the Commons be any different from anywhere else?
Where the side return has been filled in, the old external wall is now an internal one and still carries its render, its gutter line and its old fixings. Alcoves either side of the breast are rarely the same width and rarely parallel, so each one is templated as its own piece with its own scribe. No stone is ever cut from a plan. The island is the whole job here — get the exact spine position and the overhang for stools agreed on site before templating, because clients change their mind about seating after the units land.
How would you get a worktop into a property in Between the Commons?
Uniform terraces with small front gardens, permit-only parking that is full by 9am, and no vehicle access to the rear at all. Everything goes down the hallway past the stairs, and the hall width of roughly 950mm sets the maximum slab width that can be turned. A narrow entrance hall with a turn into the back of the house caps the longest piece we can physically get in, whatever the run itself measures. The templater measures that route on the same visit, so the drawing leaves site already knowing the maximum piece. That is part of what the visit is for. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.
Do you do much worktop templating around Between the Commons?
It is one of the three we do most here, behind worktop design & quotation. Same template visit, same workshop, same installers either way. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. The template visit is booked once the units are genuinely in, not when they are nearly in. Appliances on site, not on order. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Two to three hours on site, with the sink, tap and hob physically present. Units fitted, fixed and level first.
What moves the number on a quote around here?
On a heavily veined stone the island and the run behind it are nested off the same area of slab so the movement relates across the room. The template records every angle in that shape as it actually is rather than as the plan drew it. Real angles, not plan angles. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What needs to be ready before you come to Between the Commons?
Sill height gets settled with the template on site, because it is one of the few dimensions nobody has measured before we arrive. The laser plots it as it is, at the exact height the worktop will sit, and the drawing carries that through. Plotted, not estimated. Units fixed and packed level over the sloping floor, walls replastered and dry at their final thickness (tiling and splashbacks go on after the worktop, never before), and the sink, tap and hob physically on site, with a Belfast sink built in and set at its finished height. The same building type can arrive as a careful one-off kitchen or as a fast turnaround, and the honest answer is that they are priced differently. The templater needs the sink, tap and hob on site, and a Belfast sink installed at its final height. Fitted, fixed and level, then we come.
Related
More around Between the Commons
Other work we do in Between the Commons
Next step
Worktop templating in Between the Commons, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.