Richmond upon Thames · SW13
Splashbacks and upstands in Barnes
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
Barnes kitchens
What the kitchens here are actually like
Lath and plaster, a settled floor and a hall with a turn in it are the three things that decide how this job runs. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. The wall decides, not the brochure.
Check the tide and the road closures before booking a fitting day here, because the riverside streets do get cut off. Conservation area throughout, narrow lanes around the pond, and a river frontage that floods on high spring tides which can shut a delivery route for a couple of hours; parking is permit-controlled with very few visitor bays. Villa kitchens with a 3.6m to 4m run and an island are common on the bigger roads, but the small cottage terraces near the river have kitchens under 2.5m wide where a peninsula and tall storage is all that fits; several riverside houses keep the kitchen up at raised ground level because of flood history.
Cottage terraces have no hall to speak of and the front door opens almost straight into the room, which makes the carry easier and the protection harder. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. Decided before fabrication starts.
On these streets the housing is Georgian house by the pond, Victorian villa, Victorian cottage terrace and 1930s semi. That mix is why two jobs on the same road can run completely differently.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered from the New Malden patch. Fitted 3–7 working days from template.
period detached houses and villas
What gets asked for here
This is not the local speciality and there is no point saying otherwise: worktop design & quotation, worktop templating and worktop installation is what the housing here actually asks for. It is quoted, cut and fitted exactly the same way regardless.
period detached houses and villas
Getting stone into the room
Permit hours are what matters, not the permit itself, because a bay that frees up at six in the evening is no use for a template at ten. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Handling is where these pieces get damaged.
Access
Getting stone into a Barnes kitchen
Conservation area throughout, narrow lanes around the pond, and a river frontage that floods on high spring tides which can shut a delivery route for a couple of hours; parking is permit-controlled with very few visitor bays.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
New Malden patch
Barnes is worked from our New Malden run, covering South West London & Surrey.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in Barnes
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Is Barnes on your patch?
Yes. Barnes is on the patch, and the postcodes we work here are SW13. It is run from the New Malden side, covering South West London & Surrey. Without a bay the van ends up on a single yellow with a crew member watching it, which takes a pair of hands off the carry. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. One trip is always better than three. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Why would worktop splashbacks & upstands in Barnes be any different from anywhere else?
A two-up two-down has a kitchen that was never designed to be one, so the run is short, the ceiling is low and every millimetre of depth gets argued over. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. The wall makes that decision, not the brochure. Check the tide and the road closures before booking a fitting day here, because the riverside streets do get cut off.
How would you get a worktop into a property in Barnes?
Conservation area throughout, narrow lanes around the pond, and a river frontage that floods on high spring tides which can shut a delivery route for a couple of hours; parking is permit-controlled with very few visitor bays. The van gets close to the door and the stone comes off the tail lift onto a trolley, which is about the shortest carry we ever get. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. Joint positions follow from that. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.
Is Barnes really a worktop splashbacks & upstands area?
Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop design & quotation, worktop templating and worktop installation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Siliconed to the worktop, never grouted. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Siliconed to the worktop, never grouted.
What moves the number on a quote around here?
Seating overhangs past roughly 300mm will not carry on the carcass alone, so flat steel bar or a plywood substrate has to be built into the units first. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What needs to be ready before you come to Barnes?
The stone carries the scribe because the wall cannot be persuaded, so back edges are cut oversize and eased in rather than dropped straight down. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Make the wall good first, or accept the detail. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. Full-height panels need the wall made good first, which is another trade and another timescale. The wall has to be ready.
Related
More around Barnes
Other work we do in Barnes
Next step
Splashbacks and upstands in Barnes, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.