Skip to content

Islington · N1 EC1

Splashbacks and upstands in Angel

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

Angel kitchens

What the kitchens here are actually like

Georgian terraceearly Victorian terracewarehouse conversionnew-build apartment

The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. The wall decides, not the brochure.

A dense mix of period flats and newer apartments, where period conversions put the kitchen in a rear room or a former closet wing on a 2.4-3m run, while converted warehouses and newer blocks give open-plan runs with an island. Whole-house Georgian jobs put the kitchen at lower ground with garden access and a long single wall.

Check the filtered-street layout before fit day, because a wrong turn through a camera gate costs more than the delivery and the legal approach usually adds a long carry. Upper Street is a red route with bus lanes, City Road and Pentonville Road are red routes on the southern edge, and the side streets are controlled Monday to Friday with some seven-day bays near the Green. Several surrounding streets sit inside camera-enforced traffic filters, so the route in for a van is not the route a satnav gives you.

Georgian houses put the kitchen in a basement or a rear closet wing, and the stairs down to it are the tightest part of the whole route. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here — it rides the bow and hides the junction the worktop can never close on its own. The wall makes that decision, not the brochure.

What we are usually templating in is Georgian terrace, early Victorian terrace, warehouse conversion and new-build apartment. Each of those behaves differently once the old top comes off.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered from the Watford patch. Fitted 3–7 working days from template.

period detached houses and villas

Getting stone into the room

The realistic answer on a main road is an early slot, a spotter on the van and pieces staged in one movement rather than several trips. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. That is why they are crated the way they are.

period detached houses and villas

What gets asked for here

Honestly, this is not what we do most on this patch. Worktop replacement, worktop templating and worktop installation come up more often. That is a statement about the local housing rather than about the work, and nothing about how it is quoted, cut or fitted changes because of it.

Access

Getting stone into a Angel kitchen

Upper Street is a red route with bus lanes, City Road and Pentonville Road are red routes on the southern edge, and the side streets are controlled Monday to Friday with some seven-day bays near the Green. Several surrounding streets sit inside camera-enforced traffic filters, so the route in for a van is not the route a satnav gives you.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

Watford patch

Angel is worked from our Watford run, covering Hertfordshire & North London.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Angel

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Angel?

Yes. Angel is on the patch, and the postcodes we work here are N1, EC1. It is run from the Watford side, covering Hertfordshire & North London. Where the frontage is a clearway the unload happens away from the door and the carry gets longer, which is a crew and time question rather than a stone one. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. That is why they are crated the way they are. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in Angel change how worktop splashbacks & upstands works?

Walls are thick, lime-plastered and built in a soft brick, so they take a scribe well and take a fixing badly. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. Cut from the same slab run as the tops. Check the filtered-street layout before fit day, because a wrong turn through a camera gate costs more than the delivery and the legal approach usually adds a long carry.

How does the stone actually reach a kitchen in Angel?

Upper Street is a red route with bus lanes, City Road and Pentonville Road are red routes on the southern edge, and the side streets are controlled Monday to Friday with some seven-day bays near the Green. Several surrounding streets sit inside camera-enforced traffic filters, so the route in for a van is not the route a satnav gives you. Rear access usually lets us fit longer pieces whole, so the join count ends up decided by the slab rather than by the building. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Joint positions follow from that. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.

Is Angel really a worktop splashbacks & upstands area?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop replacement, worktop templating and worktop installation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Conversions put kitchens where the services could be made to reach rather than where they belong, so runs are short and interrupted. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Same batch, same run, same day. In a converted house the flat entrance and the internal doorway are usually tighter than the communal stairs, and that is easy to overlook. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Sockets final before template.

Why do two Angel kitchens the same size price differently?

A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Corners get their own pieces. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

The stone carries the scribe because the wall cannot be persuaded, so back edges are cut oversize and eased in rather than dropped straight down. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Scribed, dubbed out, or set proud. Pick one. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. A street with houses in single occupation next to the same houses cut into flats produces two completely different jobs from the same elevation. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Decided before fabrication, not after.

Next step

Splashbacks and upstands in Angel, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7479 194398