Skip to content

Croydon · CR0

Splashbacks and upstands in Addiscombe

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

Addiscombe kitchens

What the kitchens here are actually like

Edwardian bay-fronted terraceVictorian terrace1930s semismall modern block

A hundred and forty years of alterations sit under the current kitchen, and the worktop is what has to sit flat on top of all of it. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. Same slab run, same day, same batch.

One of the most consistent patterns in the borough: Edwardian terraces with a side return that gets infilled, producing a kitchen roughly 5m by 3.5m with a long run against the flank wall, a 2m island and glazing overhead. Utility space is usually a cupboard rather than a room.

Where the side return has been filled in, the old external wall is now an internal one and still carries its render, its gutter line and its old fixings. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. Decided before fabrication starts.

On these streets the housing is Edwardian bay-fronted terrace, Victorian terrace, 1930s semi and small modern block. The differences between them show up at template, not at enquiry.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered from the New Malden patch. Fitted 3–7 working days from template.

Victorian and Edwardian terraces

Getting stone into the room

No off-street parking, permit bays, and no usable side passage once the return is infilled, so slabs go in through the front door before or after the builders have finished the hall floor.

Victorian and Edwardian terraces

What gets asked for here

The research on this patch does not put this among the three commonest jobs. Worktop templating, worktop installation and worktop design & quotation do. That changes how often we are here, not how the work is done.

Victorian and Edwardian terraces

The building, and what it does to the job

Side-return infills here almost always run longer than 3m, so the joint sits under the tap where it is least visible rather than in the middle of the run.

Window boards and cills stand proud of the plaster, so the back edge of the top has to be plotted to where the units actually sit rather than to the wall. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Scribed, dubbed out, or set proud. Pick one.

Access

Getting stone into a Addiscombe kitchen

No off-street parking, permit bays, and no usable side passage once the return is infilled, so slabs go in through the front door before or after the builders have finished the hall floor.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

New Malden patch

Addiscombe is worked from our New Malden run, covering South West London & Surrey.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Addiscombe

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Addiscombe?

Yes. Addiscombe is on the patch, and the postcodes we work here are CR0. It is run from the New Malden side, covering South West London & Surrey. Enforcement zones rarely accept a trade van unloading stone as an exemption, so this gets sorted before the date is confirmed rather than argued about afterwards. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. That is why they are crated the way they are. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in Addiscombe change how worktop splashbacks & upstands works?

The back addition is a narrow two-storey outrigger with a single external wall, and the kitchen galley runs the length of it. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. The wall makes that decision, not the brochure. Side-return infills here almost always run longer than 3m, so the joint sits under the tap where it is least visible rather than in the middle of the run.

How does the stone actually reach a kitchen in Addiscombe?

No off-street parking, permit bays, and no usable side passage once the return is infilled, so slabs go in through the front door before or after the builders have finished the hall floor. Everything comes through the front door and down the hall, so the tightest point on the route is usually the newel post at the foot of the stairs. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. Joint positions follow from that. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.

Is Addiscombe really a worktop splashbacks & upstands area?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop templating, worktop installation and worktop design & quotation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Sockets final before template. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Same batch, same run, same day.

Why do two Addiscombe kitchens the same size price differently?

Rooflights along a side return mean the worktop is lit from directly above all day, which shows every ripple in a surface and every gap at a scribe. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. The joint to the worktop is siliconed, never grouted. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

Sill height gets settled with the template on site, because it is one of the few dimensions nobody has measured before we arrive. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. An upstand rides what a panel exposes. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. Full-height panels need the wall made good first, which is another trade and another timescale. Same slab run as the tops.

Next step

Splashbacks and upstands in Addiscombe, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7479 194398